Choose the McMullen Browne team you need

Commercial · Multifamily · Institutional

Protect operations while the property recovers.

Commercial losses require more than repair work. They require access planning, occupant communication, phased execution, documentation, and a practical path for keeping unaffected operations moving.

Commercial Property Restoration service illustration

Commercial · Multifamily · Institutional

What the service can include.

The actual scope is based on inspection, safety conditions, owner authorization, and project-specific requirements.

Emergency site planning

Prioritize safety, exposure, access, utilities, and operational constraints.

Assess and restore low-slope, metal, and other roof assemblies within the project scope.

Address extraction, moisture mapping, drying, and affected material decisions.

Fire and smoke restoration

Coordinate stabilization, cleaning, odor control, and reconstruction.

Mold and specialty cleaning

Define controlled work areas and service methods appropriate to the conditions.

Phased reconstruction

Sequence authorized work around occupants, tenants, schedules, and closeout requirements.

Scope note: Capacity, schedule, emergency availability, licensing, and specialty-partner needs are confirmed for each property and loss.

Coordinated restoration

Address the source, stabilize the damage, and plan the repair.

When water, wind, impact, fire, or moisture affects a property, isolated cosmetic work may leave the cause unresolved. McMullen Browne evaluates the affected systems and coordinates mitigation, cleaning, repair, or reconstruction based on the actual conditions.

A clearer path forward

What happens after you reach out.

01

Describe the condition

Share what happened, what is still changing, and which rooms or building systems appear affected.

02

Assess the property

We discuss access, visible conditions, safety boundaries, documentation needs, and the next appropriate inspection or response.

03

Define the scope

Repair, mitigation, cleaning, reconstruction, upgrades, and excluded work should be separated before authorization.

04

Coordinate the work

When the project is accepted, sequencing, communication, selections, changes, and closeout are organized around the property.